AutoCAD/MS Access Frontends with SQL Backend Integration
Problem: Each Sub-Department at the Utilities Department of the University of Colorado at Boulder have specific requirements for spatial and spatial data and often, there is an overlap of information crucial to these sub-departments; operations, maintenance, management,
etc. Equipment data is stored and maintained in an SQL database with a frontend designed in MS Access. All spatial data is stored in vector based (AutoCAD) drawings. Supervisors and management want to use a frontend interface to access and analyzed spatial and spatial data
easily.
Solution: Design, create, implement and maintain a stable application database that can generate queries based on vector and spatial (text, number date) data. All graphical data are linked with attribute (spatial) data which are managed by a RDBMS. A solution needs to be developed using AutoCAD Map as a frontend with an SQL backend.
Result: Increased in cooperation and communication among departments.
Eliminated redundant spatial and aspatial data. Cleaner PID for all different systems of the Co-Generation plant. A substantial reduction of time used to track parts, quipment manufacturer, model, part number.
Enabled access to information across multiple departments apart from bringing in greater efficiency, speedy decision-making and transparency in the functioning.
Filed Under (Uncategorized) by admin


Capacity Factor Estimator
Problem: Management needs to determine whether to buy electricity
or gas, when gas prices are low. An Xcel Energy contract establishes several parameters under which electricity will be bought from Utilities plant. There is no tool to perform a Cost-Benefit analysis into the
future.
Solution: This computer program evaluates the cost/benefit of selling electricity to public service vs. producing it. It is based on several intrinsic equations (from contract) that consider 12 month rolling calculations projected to the future.
Result: A simulation through June 05, using zero as capacity factor for one out of six months rolling average of 35%, shows another inconsistency in contract to be reviewed by Xcel energy.
This invention is directed to a unique segmented plate and associated plate assembly technique, adapted for use where access is limited to an area/chamber within which the plate is to be secured and employed for use in connection with an enclosure.
Patent Application No. 10/643,358
Problem: Management needs to determine whether to buy electricity or gas, when gas prices are low. An Xcel Energy contract establishes several parameters under which electricity will be bought from Utilities
plant. There is no tool to perform a Cost-Benefit analysis into the future.
Solution: This computer program evaluates the cost/benefit of selling electricity to public service vs. producing it. It is based on several intrinsic equations (from contract) that consider 12 month rolling calculations projected to the future.
Result: A simulation through June 05, using zero as capacity factor for one out of six months rolling average of 35%, shows another inconsistency in contract to be reviewed by Xcel energy.
read more …
Filed Under (Uncategorized) by admin

The main objective of this project was to increase production and finish a military contract within three months of operations. An even more important goal was to complete the task maintaining; a safe environment (no injuries reported), quality standards and reducing material waste.
read more …

Micro thermal actuators have the ability to provide large deflections and great force compared to electrostatic actuators. Despite their advantages and performance there is a need for an actuator that enable motion in three planes. read more …

A computer simulation application that applies statistical mechanics to predict pre-synthesis of Liquid Crystal properties from chemical structure is needed. As well as the creation of calculation, video
and data manipulation tools and a user interface.
read more …
Filed Under (Uncategorized) by admin

The redesign of a hard disk, currently in production, is a study to determine if it will ultimately increase the profit margin of a product. The two ways redesign will affect the profit margin is
lower the overall material cost and increase the production capability of the product.
read more …